BIM MANAGER

Completely integrated BIM environment, powered with automated engines for multi-disciplinary model federation and checking, quantity extraction, construction simulations and smart scheduling, advanced collaboration between participants, documentation collection and access, as well as AI-powered data analysis, offers BIM Managers total control over BIM implementation process in just one software solution.

PROJECT DASHBOARDS

Project dashboards such as BEXEL BI Analytics and Power BI Dashboards, provide BIM Managers with real-time review of comprehensive analyses, through charts and graphs, linked to the BIM model, in order to most effectively control and manage projects in the BIM environment. Dashboards enable data-driven decision-making by consolidating key project metrics into clear, interactive visual reports. Various interactive dashboards are used to perform advanced analyses, connect all important business decisions and track the project performance through the whole project lifecycle.

Image

openBIM MODEL FEDERATION

Efficient BIM project management is enabled by BEXEL Manager and BEXEL CDE platforms through automated multi-disciplinary BIM models federation performed even from different software-based BIM models by supporting open file formats such as IFC, JSON, etc.

AUTOMATED DATA ENRICHMENT

BEXEL Manager simple and fast data enrichment is automated solution for model enrichment with new properties or editing existing ones. Enrichment of model elements with specific data is crucial for efficient and automated execution of further model analyzes such as QTOs, cost management, 4D/5D scheduling and progress monitoring, etc.

Image

BIM MODEL GEOMETRY OPTIMIZATION

Created to work more efficiently with large-scale models, this feature optimizes the geometry of model elements, significantly reducing the physical complexity of the elements while maintaining their original appearance and detail. This ensures significantly increase in model performance and therefore greater efficiency for all participants.

Image

BIM MODEL ELEMENT SPLITTING

Automated process of dividing large model elements (in the entire BIM model according to custom rules to fit project needs) into smaller ones, using the splitting option, effectively prepares the model for schedule sequencing and significantly reduces the time spent organizing manual model adjustments in the authoring tool because it is done directly in BEXEL Manager platform.

Image

CODE CHECKS WITH CONTAINMENT CLASH

The feature of intersecting data obtained from element properties and element position in BIM model, through adding containment clash relation to model elements in BEXEL Manager using API, provides numerous benefits in advanced analysis of the model and its data through automation and visual clarity.

KNOWLEDGE TEMPLATES STANDARDIZATION

The standardization of numerous knowledge templates within the BEXEL Manager solution facilitates daily management of BIM processes because it enables more efficient automation by the use of already adopted rules and data from the knowledge base, and thus reduces the time required to perform daily and very narrowly specialized BIM activities such as creating construction methodologies, connecting model elements to databases, creating smart selections, clash matrix, etc. Standard templates are offered in software, website and also can be user-made or edited, and thus adapted to a specific project needs.

QUANTITY TAKEOFFS. PROPERTY-BASED FORMULAS

Smart QTOs created with use of property-based formulas enable BIM Managers and other project participants to make the best use of data associated with BIM model elements when creating QTOs to get the most out of the BIM environment, reduce time spent, and limit the possibility of errors in calculations. In this way, BIM Managers gain better control over the project.

Image

WORK BREAKDOWN / COST STRUCTURE STANDARDIZATION

The creation of a cost structure directly linked to model elements, with model-based quantity and other data, is almost completely automated, using existing quantity take offs and custom breakdowns, and additionally enabling the incorporation of standard classification formats (UniFormat, MasterFormat, OmniClass, Uniclass, etc.). This is very valuable as BIM management tool as it significantly reduces time, effort and human resources invested, which also saves money.

Image

DEFINE PROJECT ZONING

Project zoning in BEXEL Manager platform is also achieved very easily, through the identification of defined zones through element data - by smart selection sets, CBSs, QTOs, or through manual selection of elements. Also, in the smart scheduling process, through the Zone Editor option specific zones, their relations and references are determined and finetuned for the most efficient and precise construction schedule creation.

SUPPORT LEAN CONSTRUCTION PLANNING

BIM Managers' lean construction planning is enabled by BEXEL solutions through real-time model-based and look-ahead planning, visual 4D/5D construction simulations, early clash detection analysis, planned vs. actual progress tracking, transparent and collaborative planning and Last Planner System. This way BIM Manager ensures continuous project improvement, efficient team collaboration, eliminating excessive costs and maximizing value to the Client.

Image

ADD/EDIT BIM MODEL ELEMENT ATTRIBUTES

BEXEL Manager and BEXEL CDE platforms both enable adding/editing of BIM model element attributes at any time, either manually or automatically through data enrichment process. By incorporating this process, BIM Manager significantly contributes to the usefulness of the model for further analysis, planning and construction processes, while significantly reducing the time spent on model optimization in the authoring tool.

SUPPORT OPERATIONAL TAKT PLANNING PER CONTRACTOR AND WITH ATTRIBUTE BASED TAKT

Takt Planner panel in BEXEL CDE allows the lean process of takt planning to be fully overviewed/customized by BIM Manager as a part of optimization/finetuning of detailed construction schedule for the purpose of more detailed work organization and control, while directly linked to the BIM model elements. The process is extremely flexible and allows optimization or review of the takt plan by contractor, attribute, or any other data that is crucial for planning process. This way early identification and construction delays avoidance is ensured.

Image

INTEGRATION OF AS-BUILT INFORMATION

With BEXEL solutions integration of the as-built information into BIM projects begins already in the phase of work execution through BEXEL Docs by linking the project documentation to the project and model elements, and then adding the necessary certificates, attestations and other documentation. BIM model, to which the information is linked, is also always up-to-date, by constantly monitoring the work performed in terms of both geometry and data linked to the model elements. In this way, BEXEL offers a complete process related to the as-built project because it combines drawings, documentation, records and the model in one solution.

MULTI-VERSION MODEL STATISTICS

Through BEXEL Manager and BEXEL CDE cloud-based solutions, BIM Manager can easily view and manage all model versions, as well as their users and administrators through simple project/versions menus, where all project versions data is listed. In addition, BIM model version statistics can be reviewed in Portfolio Manager panel through single project or multi-project charts analysis.

CONDUCTING BIM COORDINATION AND MANAGEMENT MEETINGS

BEXEL CDE cloud-based solution is perfect for BIM coordination and management meetings because, while not being technologically demanding, data-filled BIM projects in direct connection to BIM models are easily accessed and managed even through phones and tablets, which provides flexibility for meeting participants regarding time, place, and availability of information. Also, project dashboards (BEXEL BI Analytics and Power BI Dashboards) allow quick review various project/model analyses and focus directly on specific problems.

IMPLEMENTING ISO 19650 INFORMATION MANAGEMENT STANDARDS

The BEXEL Manager platform is configured in accordance with the international ISO 19650 standard, enabling teams to implement and manage BIM data into construction projects following globally recognized best practices. This ensures enhanced collaboration, accountability, and quality throughout all project phases - from design and construction to operation. Seamlessly integrated with BEXEL CDE, the platform also supports secure, centralized, and controlled sharing of data and documentation, aligning with the principles of a Common Data Environment as defined by ISO 19650.

4D/5D CONSTRUCTION SIMULATIONS

4D and 5D construction simulations integrate time and cost data with the 3D model to deliver a comprehensive project overview. These simulations allow BIM Managers to visualize the construction sequence over time, detect scheduling issues, identify inefficiencies, and validate the feasibility of the construction plan. This enables more accurate planning, early detection of out-of-sequence activities, logistical conflicts, potential delays or cost overruns, comparing planned progress/costs with actual values in real-time. Construction simulations also enhance BIM Manager's communication with contractors and stakeholders through visual timelines.

Image

REALISTIC SIMULATIONS 4D/5D + GOOGLE EARTH INTEGRATIONS

BIM construction simulations integration with Google Earth (GIS - geographic information system) allows BIM models to be visualized and analyzed in the actual geographic location thus optimizing planning, visualization, collaboration, and decision-making across construction and infrastructure projects. It provides overview of actual project environment and terrain which improves site-planning and decision-making by visualizing how a building interacts with its surroundings, topography, infrastructure, and environmental factors.

Image

CLASH ISSUES & RESOLUTION COLLABORATION

Through BEXEL CDE and BEXEL Manager platforms, comprehensive conflict analyses are available for review, communication and resolution between all project collaborators in real time, during planning, design, and execution phase. Advanced clash detection technology within multidisciplinary projects and BIM models has been enhanced by BEXEL BCF.Server, which enables fast creation of detailed reports on project issues and their efficient resolution through transparent communication and collaboration among project participants.

RFIs COMMUNICATION

BEXEL BCF.Server and BEXEL Docs modules within BEXEL CDE ecosystem enable and enhance communication between BIM Managers and Designers/Planners/Subcontractors, etc. by enabling clarity in information sharing, documentation exchange and access rights on a project through all of its versions.

DOCUMENTATION APPROVALS & COMMUNICATION

Through BEXEL BCF.Server and BEXEL Docs modules documentation approval process has been significantly optimized by controlled access rights procedure, the transparency of process of documentation linking with the BIM environment, while direct communication between project collaborators regarding individual files or folders through the comment section has been enabled.

DOCUMENTATION MANAGEMENT & VERSIONING

Storing and managing all project documents and their various versions throughout the entire project lifecycle is enabled within the cloud‑based document management system BEXEL Docs. Organizing project documentation by folder and subfolder structure, as well as advanced documentation filtering by element selection, facilitate and accelerate project documentation linking, versioning and management.

COMMUNICATION ANALYTICS

Through BEXEL BCF.Server and BEXEL Docs module, all activity on project-related documents, such as safety incident reports, RFIs quality issue reports, reports on documentation submittals and transmittals, clash issue reports, etc., can be analyzed and managed by BIM Manager in both BEXEL Manager and BEXEL CDE. This allows for a comprehensive project issues review, timely reaction, remediation of the problems and prevention the occurrence of new ones, and enables fine-tuning of daily and weekly activities for smoother execution. Communication being clear and performed in real-time (notifications via application and e-mail are supported), offers transparency, timely warning and problem solving, as well as more efficient damage control.

DOCUMENTS ANALYTICS

Through BEXEL BCF.Server and BEXEL Docs module, all activity on project-related documents and their statuses, such as approved/rejected/delayed documents, approvals or project versions, can be analyzed and managed by BIM Manager in both BEXEL Manager and BEXEL CDE. Through a simple and comprehensive overview, it is possible to respond in a timely manner and resolve situations that could lead to significant delays and increased construction costs. In this way, BIM Manager is always up to date with the status of the project documentation and its impact on the further course of work execution. With addition of Portfolio BI Analytics, filtering and managing documentation by various parameters and showing statistics through charts is significantly simplified.

AS-BUILT DOCUMENTATION COLLECTION

Within the BEXEL Docs. module, every change in the project design and the on-site execution of the works is recorded by linking the appropriate project documentation to the model elements themselves, and in this way, BIM Managers have access to the current as-built documentation at any time even during the construction period. Completeness of as-built documentation can be checked and reviewed through BEXEL BI Analytics and Power BI Dashboards which can be shared with other appropriate collaborators. The same goes for BIM Model versions which are also collected in both BEXEL Manager and BEXEL CDE platforms.

SIMPLIFIED HANDOVER

BEXEL Manager, as comprehensive BIM software solution, plays a crucial role in project handover to the Client by streamlining the transfer of complete, accurate, and structured project data. In centralized data environment it is ensured that the latest and approved versions of the models and documentation are available for handover. All operational data is linked to model elements and all documentation is easily exported to common file formats. Open BIM supports standards like COBie, making it easier to deliver structured asset and O&M data at handover.

2

Navigation

On the top you can see the main navigation

In the bottom right corner you can ask for support any time

If you want to close this guide, just click on the X